Information Générale

  • IR% : 8
  • CoC% : 8
  • Minimum : 0 GBP
  • Type de financiation : -
  • Type de bien : -
  • Investisseurs : 328
  • Date de lancement : 2019-10-19
  • Date de fin : -
  • Objectif : 455k GBP
  • Complété : 100%

Information additionnelle

  • Land at Hinton St George
  • TA178SL
  • Somerset
  • Somerset
  • Royaumes-Unis

This is phase 2 of a multi phase raise totaling £2,800,000 to provide construction costs for the development of 10 new residential units in Hinton St George Somerset. The loan was completed in Mid 2018 and an initial advance of £455,000 was submitted to the borrower to cover design fees and initial construction costs. However after aborted protracted negotiations with a 3rd party contractor the borrower moved to employ Project/Site manager directly allowing him to commence works in September 2019. Hinton St George, Somerset, TA17 8SL is situated 4 miles north west of Crewkerne, 12 miles south west of Yeovil and 17 miles south east of Taunton. Crewkerne Railway Station is based on the West of England mainline approx. 5 miles from Hinton St George with trains to Exeter (50 mins) and London Waterloo (2.5 hours). Hinton St George is a popular and affluent South Somerset village with a population of circa 442 (2011 Census). The village includes a primary school, award winning pub and village store. The site is situated on the East side of the village and has been in the ownership of the same family for nearly 40 years. It is rectangular in shape with a level topography and totals approx. 1.02 acres. Access to the site is directly off Merriott Road a public highway. There is a private farmers right of way from Merriott Road through the site to access the rear field. Planning consent was granted ref. no. 17/02545/FUL on 19th April 2018 by South Somerset Council. A further application no. 18/01345/S73 was approved to vary internal layouts, window positions, the removal of car ports and minor external alterations. The total no. of new units to be erected will be 10 ranging from 2 – 5 bedroom houses. Three of the units will be set aside for Affordable accommodation as required within the planning consent. Construction will be high quality traditional 2 storey development to include local “Ham” stone elevations under pitched and hipped roofs. The breakdown of the sizes of the houses are as follows:- Plots 1-3 3 x 2 bedroom house 959 sq ft each Plot 4 1 x 5 bedroom house 1,721 sq ft Plots 5-6 2 x 3 bedroom house 1,026 sq ft each Plot 7 1 x 3 bedroom house 1,018 sq ft Plot 8 1 x 4 bedroom house 1,231 sq ft Plot 9 1 x 4 bedroom house 1,246 sq ft Plot 10 1 x 5 bedroom house 1,711 sq ft Total floor area: 10,830 sq ft (1,006 sq m) Works commenced on 2nd September and the build programme is 13 months with Practical completion expected in October 2020. The total build contract sum is estimated at £2,591,000 and the IMS has reported that completed works to date include site clearance, temporary on site road, foundations sunk to plots 1-8 and piling part ring beams to plots 9-10. On inspection by CrowdProperty on 8th October all foundations had been completed, surface water drainage was underway and the Ham stone brick/block work to DPC level was underway. Block work to one part was complete with scaffolding due. The IMS is reporting the programme has not as yet been affected by the weather and is still on schedule. There has been an overspend of £6,000 for additional piling previously not accounted for and total spend as at the date of the IMS report was £308,000 paid directly by Borrower. This includes application for Utility connections and 10 year warranties.

Projet proposé par

CrowdProperty

Gagnez 8% par an de retours garantis à première charge, exempts d'impôt par le biais de l'ISA CrowdProperty.

Souhaitez vous ajouter cette plateforme à votre liste de favoris ?

Vous devez être connecté

Vous n'avez pas de compte ?

Inscrivez-vous et profitez de tous les services qu'offre BrickFunding
Créer un compte